How the calculator works

Volume is length x width x thickness. The calculator turns the thickness into feet (or meters), multiplies, and adds the extra you choose. Then it converts the volume to cubic yards (27 cubic feet each) and divides by what one bag makes.

For a round post hole or a column, use the length and width of the hole as a square: the result will be a little high, which is fine for a small job.

Bags or a truck?

Bags are practical for small jobs: post holes, a small pad for an air conditioner or a few steps. Mixing by hand gets slow and tiring after about 20 to 30 bags, and every bag has to set at a similar time to avoid weak joints. For about one cubic yard (0.75 m³) or more, compare the price of ready-mix concrete delivered by truck. Many suppliers have a minimum order, and some offer small loads for an extra fee.

Typical bag yields

BagMakes aboutBags per cubic yard
40 lb (18 kg)0.30 cu ft90
60 lb (27 kg)0.45 cu ft60
80 lb (36 kg)0.60 cu ft45
25 kg (Europe)about 0.012 m³about 85 per m³

Common thicknesses

Most slabs also need a compacted gravel base of 4 inches or so below the concrete, and many need wire mesh or rebar. Rules change by place and by use, so check your local building code for anything structural.

Frequently asked questions

How many bags of concrete do I need for a 10x10 slab?

A 10 x 10 ft slab 4 inches thick is 33.3 cubic feet. With 10% extra that is about 37 cubic feet: roughly 62 bags of 80 lb, 82 bags of 60 lb or 123 bags of 40 lb. At that size, a truck is often easier.

How thick should a concrete slab be?

4 inches (10 cm) is usual for patios, walkways and shed bases. Driveways and heavier loads are often 5 to 6 inches.

How much does one bag of concrete make?

An 80 lb bag makes about 0.6 cubic feet, a 60 lb bag about 0.45 and a 40 lb bag about 0.3. The exact yield is on the bag.

How long before I can walk on new concrete?

Usually after 24 to 48 hours for foot traffic, and about a week before driving a car on it, depending on the mix and the weather. Concrete keeps getting stronger for about a month.